- Image via Wikipedia
I received a bill from Jamaica Public Service via email on Monday morning (September 13). The bill had an amount due of $49,021.51. The readings were – Current meter reading: 3667 kWh; Previous estimated meter reading: 2106 kWh.
This varies from a normal bill of approximately $17,500 with absolutely no change in my consumption or usage pattern. A quick check on the meter showed that the current reading is in fact 2727 kWh, three days after the meter was ‘read’ on September 10. On the bill was a note AH1 which overleaf read:
“Your meter was read and our quality checks identified your reading as high. However, further checks suggest that the reading was correct and so it was used to bill your account.”
While the person at JPS promises to have the matter checked, it leaves me to ask three questions:
1. What “further checks” could JPS have done in the intervening period which covers Saturday and Sunday?
2. Were I not able to read the meter, what kind of hassle would I have to undergo to have this matter resolved?
3. Am I going to hear that the meter is malfunctioning after requesting at least three meter checks over the last two years and being told that the meter is correct?
Clearly, JPS needs to modify its procedures to ensure that cases like this actually undergo some sort of quality-control checks before they reach the consumer.
I am, etc.,
DONATH E. JUMPP