Electricity charges are expected to drop by up to six per cent this month.

This after the Jamaica Public Service Company (JPS) lowered the fuel and IPP charges to customers by just over $2 per kilowatt hour (kWh), when compared to the rate used in May.

According to the JPS, this means that a typical residential customer whose usage remains constant at 200 kWh will see a reduction of approximately six per cent in their electricity bill.

In a statement last evening, the light and power company said the decision to reduce its fuel and IPP charges was based on the recent downward trend in oil prices.

https://solarbuzzjamaica.com/wp-admin/post-new.php

1. Overview

1.1 PURPOSE

1.1a What is the purpose of the Net Billing Standard Offer Program?
The Net Billing Standard Offer Program is intended to support greater use of renewable sources of energy in
Jamaica. The program seeks to encourage electricity production by small intermittent sources of renewable
energy of 100kW or less, via a simple contract arrangement. These installations will require supplemental power
from the JPS and will on occasion have excess electricity, which can be sold to the utility – so long as the Gross
System Output does not exceed 10kW AC output for residential facilities, or 100kW for commercial facilities.

1.1b Who Initiated this Program?
The Government of Jamaica as part of its Energy Policy has proposed a number of initiatives to make investment
in electricity generation for the public grid from renewable sources, economically viable. The Government has set a
target where 15% of total generation should be provided from renewable energy sources by 2015. The
OUR, which is responsible for the addition of generating capacity to the grid, has reserved a block of capacity for
renewable sources, one portion of which should be in the category of 100kW or less.

read more…
http://www.myjpsco.com/_pdfs/Net-Billing_Questions_Answered.pdf

A hybrid renewable energy system utilizes two or more energy production methods, usually solar and wind power. The major advantage of solar / wind hybrid system is that when solar and wind power production are used together, the reliability of the system is enhanced. Additionally, the size of battery storage can be reduced slightly as there is less reliance on one method of power production. Often, when there is no sun, there is plenty of wind. In comparison to solar modules, wind turbines can offer a more favourable dollar per watt ratio.

You want to consider a hybrid system when you

Energy Efficiency Project Launched to Assist SMEs
Thursday, 21 June 2012
Written by JIS

The Development Bank of Jamaica (DBJ), in partnership with the Inter-American Development Bank (IDB), has launched an energy efficiency project targeted at Small and Medium-sized Enterprises (SMEs).

The project, called DBJ GreenBiz, is aimed at providing technical and financial assistance in energy efficiency, conservation and renewable energy to SMEs.

Minister of State in the Ministry of Science, Technology, Energy and Mining, Hon. Julian Robinson, lauded the programme at its official launch on June 20, at the Mona Visitors

June 22, 2012

Dear Energy Partner:

Secure Your Energy Future with the IS0 50001 Energy Management Seminar

The Jamaica Public Service Company Limited in collaboration with the Bureau of Standards Jamaica doing business as National Certification Body of Jamaica (NCBJ) will be hosting the captioned seminar in Kingston on July 10, 2012 and in Montego Bay on July 1

The purpose of the seminar is to generate awareness and encourage applicability of the need to employ sustainable energy efficiency measures. This will not only alleviate the impact of the spiraling costs associated with the use of electricity, but will also help to improve your company

 

The Office of Utilities Regulation (OUR) wants to audit power providers, including Jamaica Public Service Company (JPS), to ensure that customers are correctly charged for fuel when world oil prices fluctuate.

The audit will result in recommendations made to the OUR to “effectively manage” the fuel accounting systems of JPS and two independent power providers (IPP).

It plans to hire a consultant auditor for this purpose. Bidding for the job closes June 27.

“The OUR intends to engage the services of a qualified, experienced and competent auditor to carry out an audit of Jamaica’s power system fuel management policies and practices in order to facilitate regulatory oversight of the fuel cost component of electricity charges to consumers, and to create a database of fuel usage cost and efficiency in the system,” stated the OUR in its notice published June 10.

Officials at the regulatory agency were said to be travelling and unavailable for comment.

Fuel represents the largest component on bills and also the bulk of JPS’s expenses at US$206.2 million for its March 2012 quarter, up 23 per cent year on year. Even small fluctuations in oil prices will result in large dollar movements on total customer bills.

JPS, the sole power distributor, buys oil at world market prices with some 30 per cent of its power requirements coming from IPPs. It then passes the cost of oil to customers, ostensibly at cost price.

The OUR wants the consultant to determine: whether JPS fuel policies and practices routinely generate accurate fuel charges billed to customers; and if JPS’s fuel management is compliant by analysing historical and current fuel procurement, fuel usage and general fuel accounting.

JPS bill subdivisions

JPS bills contain two main subdivisions: meter usage and fuel & IPP charges. The fuel charge on bills covers the cost of the fuel required to produce and deliver each kilowatt hour of electricity, and “some” of the costs of the power JPS buys from IPPs, said JPS on its homepage.

“This figure may change based on the cost of oil on the world market,” said JPS.

Currently, fuel and IPP charges are near all time highs at J$21.82 per kilowatt-hour in June 2012 compared with J$8.66 in January 2009, according to JPS statistics on its homepage. Last month, the rate stood at J$24.06 per kilowatt-hour.

JPS needs approximately 20,000 barrels of oil each day to meet the daily electricity demands of customers nationwide. “The company must purchase this oil at world market prices which may vary each month,” said JPS on its home page.

business@gleanerjm.com

http://jamaica-gleaner.com/gleaner/20120613/business/business3.html